How Much Safety Stock Should I Keep for a Wick That Is Used Across Several Bestselling Candle SKUs?

How Much Safety Stock Should I Keep for a Wick That Is Used Across Several Bestselling Candle SKUs?

 

Eco C2 ₹9.44 a wick at every pack Buffer 155 C2 = ₹1,463.20 Lead times: ask on WhatsApp
One wick · several top-selling SKUs
One pooled buffer, the lot check inside the lead time, and a reserve for the season that can't stop.
★★★★☆
"Good quality .... if possible delivery date would be try little bit quick please"
Subhankar RoyVerified buyer · Sep 2024
Eco Candle Wicks
★★★★★
"Quality wick, works very well"
AshwiniSep 2025
Eco Candle Wicks
★★★★☆
"Quality of the wick is good for jar candles, team can work on the pricing and delivery timelines."
Monika DeepVerified buyer · Oct 2025
Eco Candle Wicks
★★★★★
"Good quality wood fragrance oil with a warm, long-lasting scent and strong performance in candles."
Payal PatelVerified buyer · Mar 2026
Woody Oud Fragrance Oil
★★★★★
"Quality is good with good fragrance"
Avanthi CheeliVerified buyer · Nov 2025
Citrus Lemon Fragrance Oil
★★★★☆
"Fragrance is awesome. Hot throw is also very good after burn candle."
AkanshaVerified buyer · Dec 2025
Lavender Fragrance Oil
★★★★☆
"Good quality .... if possible delivery date would be try little bit quick please"
Subhankar RoyVerified buyer · Sep 2024
Eco Candle Wicks
★★★★★
"Quality wick, works very well"
AshwiniSep 2025
Eco Candle Wicks
★★★★☆
"Quality of the wick is good for jar candles, team can work on the pricing and delivery timelines."
Monika DeepVerified buyer · Oct 2025
Eco Candle Wicks
★★★★★
"Good quality wood fragrance oil with a warm, long-lasting scent and strong performance in candles."
Payal PatelVerified buyer · Mar 2026
Woody Oud Fragrance Oil
★★★★★
"Quality is good with good fragrance"
Avanthi CheeliVerified buyer · Nov 2025
Citrus Lemon Fragrance Oil
★★★★☆
"Fragrance is awesome. Hot throw is also very good after burn candle."
AkanshaVerified buyer · Dec 2025
Lavender Fragrance Oil
Reviews collected and published through Judge.me on candlemakingsuppliesindia.store. They are general reviews of the products named on each card, not assessments of the advice set out below. Wording is unedited.
✓ Prices verified 7 October 2026, stock checked per pack ✓ GST invoice; MSDS and IFRA documentation on request ✓ Raw materials only — CSI does not sell finished candles
CSI Wick Decisions · Safety Stock
Pool the weekly demand of every SKU on the wick, count the lot check as part of the lead time, and decide what a failed lot will cost you before it happens.
749 wicks
reorder point for one Eco C2 wick across four SKUs · worked example
Quick answers — read this first
How much safety stock for a wick that several SKUs share? Calculate it once, on the combined weekly draw, not four times. In the worked example, Eco Thick (C2) across four 200 g SKUs needs a pooled buffer of 155 wicks and a reorder point of 749, against 93 wicks if each SKU's demand buffer were worked out on its own.

What lead time do I use? Yours, plus the lot check. CSI publishes no lead times; the worked example uses 2 weeks of supply (labelled) plus about 1.5 weeks to release a new lot, so 3.5 weeks. A pack waiting for its lot check isn't usable stock yet.

What's the real risk? Not sales wobble: a bad wick lot. When four SKUs share one wick, one failed lot stops all four. That's why the release check sits inside the lead time, and why a lot-failure reserve of 594 wicks (₹5,607.36) is worth holding before Diwali, and usually not otherwise.

What does it cost? 155 C2 wicks is ₹1,463.20. C2 costs ₹9.44 a wick at every pack, so a bigger buffer never buys a cheaper wick.
The short answer
Pool it: add the SKUs' weekly wick draw together and work out one buffer from the total's variation, not four buffers added up.
Lead time: supply time (yours to measure) plus the days a new lot spends in its check; count packs on order and in quarantine in your stock position.
Formula (labelled): buffer = 1.65 × √(L × σ² + d² × σL²); reorder point = d × L + buffer. Worked example: 594 + 155 = 749 wicks.
Shared-lot risk: release every new lot in the two formulas that bracket your SKUs before any of it reaches the bench; add a lot-failure reserve for festive months.
One wick, four SKUs: pool the buffer Eco Thick (C2) · 3.5-week effective lead time · factor 1.65 · worked example, wicks Demand buffer 0 40 80 120 160 Four SKUs, separately Lav 28 Oud 20 Lem 27 Rose 18 93 Pooled, if independent 47 Pooled, your weekly totals 66 + lead-time wobble 155 wicks The reorder point, built up demand over 3.5 weeks · 594 optional lot reserve · 594 buffer 155 reorder point 749 with reserve 1,343 0 200 400 600 800 1000 1200 Count packs on order and packs waiting for their lot check as part of the 749. The reserve is a festive-season decision, not a standing rule.
Top: demand buffers for one Eco Thick (C2) wick shared by four 200 g SKUs, worked example. Buffering each SKU separately needs 93 wicks; one pooled buffer needs 47 if the SKUs moved independently, but 66 from the real weekly totals, because they tend to rise and fall together. Supplier lead-time variability (dashed) takes the pooled buffer to 155. Bottom: reorder point = 594 wicks of demand over the 3.5-week effective lead time + 155 = 749. The dashed lot-failure reserve is optional and seasonal.
Straight answer
How much safety stock should I keep for a wick that is used across several best-selling candle SKUs?
Treat the wick as one stock item with one combined demand. Add up the wicks every SKU draws each week, work out the average and the variation of that weekly total, and size one buffer from it: a common textbook method is 1.65 × the weekly standard deviation × √(lead time in weeks), which covers roughly 19 replenishment cycles in 20 if demand behaves, plus a term for how much your supplier's lead time varies. Use your real weekly totals, not a theory: SKUs that sell together (gifting weeks, festivals) pool less than independent ones. Lead time is the supplier's time to your door plus the time a new lot spends being checked, because a pack in quarantine can't be wicked. In the worked example, four SKUs on Eco Thick (C2), averaging 169.5 wicks a week between them, need a buffer of 155 and a reorder point of 749 wicks. Then handle the risk pooling makes worse: one wick lot now feeds four top-selling SKUs, so a lot that fails its check stops them all. Release every lot in the two formulas that bracket your range before it reaches the bench, and in festive months consider a lot-failure reserve of one more lead time's demand (594 wicks, ₹5,607.36).
One line: one buffer from the combined weekly draw, lead time including the lot check, and a lot-failure reserve when the season can't afford a stopped bench.
Hold the buffer as sealed, released packs: the worked example's 155-wick buffer becomes 100 + 50 + 10 = 160 Eco Thick (C2) for ₹1,510.40, labelled "safety stock, lot ___, released __/__". Every C2 pack is ₹9.44 a wick, so it doesn't matter which packs make up the count. In stock on 7 October 2026.
Eco C2 100-pack — ₹944.00

Your shared wick, made precise

Four top-selling SKUs. One wick. One empty bin on a Thursday.

The worked example, labelled. Four SKUs, each a 200 g candle at 8% (16 g of oil and 184 g of wax, load as a percentage of total weight) in your own 8 cm jar, all approved on Eco Thick (C2) after full-life burns: Lavender, Woody Oud, Citrus Lemon and British Rose. Woody Oud was the hardest to approve; its first wick sooted by hour three and C2 was the rung that passed. These four sell steadily, so the C2 bin empties steadily, and last month it emptied two days before the next pack arrived. Someone suggested wicking a Woody Oud batch on Thin (C1) "just this once". It didn't happen, but it shows the real cost of a stock-out: a substitution that undoes the test that fixed the soot (the master formula fields that forbid it are 6996).

Your question is how many C2 to hold so that doesn't happen again, without filling a cupboard. The records you need are the wicks drawn from the bin each week for each SKU (candles plus wicking rejects), how long your supplier takes from order to door, and how long your new-lot check takes. Eight weeks of the worked example's draw:

Eco Thick (C2) drawn per week · four SKUs
Worked example · candles plus rejects · your own records replace these
Week Lavender Woody Oud Citrus Lemon British Rose All four
Week 1 60 40 30 25 155
Week 2 72 45 45 28 190
Week 3 55 32 25 20 132
Week 4 80 50 38 30 198
Week 5 66 38 50 22 176
Week 6 58 35 28 35 156
Week 7 75 48 35 18 176
Week 8 62 44 41 26 173
Mean 66.0 41.5 36.5 25.5 169.5
Std dev 8.9 6.3 8.7 5.6 21.1
Safety first, plainly: stock maths exists so the approved wick is always the one in the candle. A tall, smoking flame from a substituted wick is a safety problem before it is a stock problem. If a batch was ever wicked with something other than its approved spec, hold it and burn a retained candle in still air, on a heat-safe surface, never unattended, stopping the session if the flame smokes or reaches toward the glass. Never judge glass heat by touch; use your own non-contact thermometer (CSI lists none).

Why one wick across four SKUs changes the arithmetic

Four small wobbles partly cancel. One bad lot doesn't.

Demand pools. Each SKU's week-to-week draw wobbles: Lavender between 55 and 80, British Rose between 18 and 35. Buffer each one separately and you hold enough for every SKU's bad week at the same time, which rarely happens. Add the draws together first and some of the highs and lows cancel: the combined total's standard deviation (21.1) is clearly less than the four separate ones added up (8.9 + 6.3 + 8.7 + 5.6). That's the whole case for one pooled buffer. It's also the honest case for holding fewer wicks than four separate calculations suggest: 93 against 66 for the demand part.

But it pools less than theory says. If the four SKUs were independent, the pooled buffer would be 47. Calculated from the real weekly totals it's 66, because your SKUs move together: a gifting week lifts all four. That's why the method below uses the variation of your actual weekly totals rather than a formula that assumes independence. In festive weeks they move together even more; plan those separately.

Risk concentrates. The same pooling that saves wicks puts four top-selling SKUs on one lot. If a new C2 lot burns taller than the retained sample, all four formulas are affected at once, and Woody Oud, already the closest to its soot limit, shows it first. So a shared wick needs two buffers with different jobs: a demand buffer for normal variation, and a decision about what you'll do when a lot fails. For how the wick-SKU count itself is decided, see the published post on reducing wick SKUs without forcing every fragrance into one wick.

When the shared wick runs short or gets held: causes, ranked

A stock-out is a symptom too. Find out which kind before you add wicks.

The ranking is our judgement for a small maker with one wick shared across several SKUs. The table separates causes that come from how customers burn your candles from causes in what you make and buy, because one of them often triggers a hold that empties the bin for no reason.

Cause ranking · shared wick runs out or is held
Demand, supply, material, production, customer burning and formulation, separated · cheapest check first
Cause What you'd see Discriminating test Fix Cost
1. Correlated demand spike (sales) All four SKUs up in the same weeks Weekly totals: is the spike in the total or one SKU? Plan festive weeks separately; pooled buffer from real totals A few more wicks
2. Lead time longer than planned (supply) Orders arrive later than your reorder point assumed Log order and arrival dates for every pack Use your measured lead time and its spread 89 wicks in the example
3. New lot held at its check (material) Full packs on the shelf, empty bin Is the release time inside your lead time? Order earlier by the check time Nothing; timing
4. Rejects above the allowance (production) More wicks drawn than candles made Wicks drawn ÷ candles poured, per week Fix centring and sticking; record rejects Labour
5. A soot complaint triggers a lot hold (customer burning vs formulation) One customer photo, whole lot quarantined Burn a retained candle from that batch per your label: clean means burning habit, not the lot Answer the complaint; release the hold One retained candle
6. A formula moves to another wick (formulation) One SKU's draw disappears from C2 Change log Recalculate the pool without it Nothing

Cause 5 deserves its row. A single customer photo of a black rim is usually about trimming, burn length or a fan (that's the soot cluster's whole lesson, the soot hub), but a nervous maker can quarantine the whole shared lot and stop four SKUs. One retained candle from the complaint batch, burned the way your label says, settles it in a session (what to retain and how to use it). Cause 3 is the one most small makers miss: they set a reorder point on the courier's lead time and forget the ten days the new pack sits waiting for its lot check.

The pooled safety stock, step by step

Five numbers from your own records. One formula. Round up.

This is a standard textbook method, labelled as such, not a candle-industry rule. It assumes weekly demand is roughly bell-shaped and that eight or more weeks of records are representative. If your history is shorter, or dominated by one big order, treat the result as a starting point.

Pooled safety stock and reorder point · Eco Thick (C2)
Worked example · d = mean weekly total, σ = its standard deviation, L = effective lead time, σL = spread of supply lead time
Step Input or formula Worked example Note
1. Weekly demand d = mean of weekly totals 169.5 wicks Candles plus rejects, all four SKUs
2. Its variation σ = standard deviation of weekly totals 21.1 wicks From the totals column, not the SKUs
3. Effective lead time L = supply + lot check 2 + 1.5 = 3.5 weeks Supply time is yours to measure; CSI publishes none
4. Demand over L d × L, rounded up 594 wicks What you'll use while waiting
5a. Demand buffer 1.65 × σ × √L 66 wicks 1.65 ≈ 95% of cycles (normal approximation)
5b. With lead-time spread 1.65 × √(L × σ² + d² × σL²), σL = 0.5 week 155 wicks The supplier's wobble adds 89
6. Reorder point d × L + buffer 749 wicks Compare with on hand + on order + in quarantine

Two things in that table usually surprise people. The lead-time spread matters more than the sales spread. Half a week's uncertainty in when the pack arrives adds 89 wicks, more than the whole demand buffer. If you want a smaller buffer, measuring and steadying your lead time does more than forecasting sales. Ask us on WhatsApp for a realistic dispatch estimate to your city; we'll say what's typical and won't promise what we can't. The reorder point is compared with your stock position, not the bin: wicks on hand + packs ordered but not arrived + packs arrived but still in their lot check. Otherwise you'll reorder twice.

Then the money, honestly. Pooling saves 27 wicks of demand buffer against four separate calculations, worth ₹254.88 at ₹9.44. That's small, because wicks are cheap. The reason to pool isn't the rupees; it's that one well-sized buffer is easier to keep honest than four, and it shows you the shared-lot risk clearly. Argued against our own interest: don't round a 155-wick buffer up to a 1,000-pack "to be safe". The C2 1,000-pack is ₹9.44 a wick like the 10-pack; it only ties up cash. How large each order should be (a month, six weeks, six months) is 6998; the full purchase-quantity formula is 6999.

Festive weeks (worked example, labelled)
If Diwali weeks run at about 1.5 times the normal draw for all four SKUs together, demand over the lead time becomes 890 wicks, and the reorder point moves with it. Don't let a buffer built on ordinary weeks carry a festive month; recalculate from last year's festive weeks if you have them, or set a festive reorder point by hand.

The second risk: one lot stops four SKUs

Pooling shrinks the demand buffer. It concentrates the lot risk.

A demand buffer protects you from ordinary wobble. It does nothing if the new pack burns differently, because the buffer and the new pack may be the same lot. Two rules handle that. First, never open a new lot until it's released, and keep the previous released lot as the working stock while the new one is checked; that's why the check time sits inside the effective lead time. Second, decide in advance what happens if a lot fails. A failed check means another order, another supply wait and another check: one more effective lead time, about 594 wicks of demand. You can hold that as a lot-failure reserve (₹5,607.36), taking the reorder point to 1,343, or accept the gap and plan to pause the four SKUs for about 3.5 weeks. The failed check alone leaves about 255 candles' worth of wicks unusable for its 1.5 weeks. Our judgement: hold the reserve for the festive run-up, when a stopped bench is expensive, and not for the rest of the year.

The release test itself is the lot-comparison method in 6994, which owns the measurements and the paired limits. What a shared wick changes is which formulas you test in: not all four, and not one at random, but the two that bracket the range.

1
Pick the bracket from your approval recordsThe shared formula that ran closest to its soot or mushroom limit (worked example: Woody Oud) and the one whose pool reached the glass slowest (Citrus Lemon). A stronger lot shows first in the first; a weaker lot in the second.
2
Pour 14 candles from one melt per formulaWoody Oud: 3 new-lot, 3 retained-lot. Citrus Lemon: 3 new-lot, 3 retained-lot. Lavender and British Rose: one new-lot candle each, as a screen. All 200 g at 8% in your 8 cm jar, 2,576 g of wax in all, same cure (both bracket oils' pages say 48–72 hours before burn testing).
3
Write the release rule before lightingEvery new-lot candle passes your in-house limits in every third, and the new-lot means stay within your paired limits of the retained-lot means in both bracket formulas. One fail fails the lot for all four SKUs. An in-house protocol, not an industry standard.
4
Burn in four-hour sessions, side by sideStill air, trimmed to 5–6 mm, positions swapped each session. Log flame height, pool width and depth, mushroom and a white soot card at hours 1–4, grams lost per session on one scale, and glass at fixed points with your own non-contact thermometer.
5
Go to the floor in the bracket formulasAbout 7 sessions each at roughly 7 g an hour above a 25 g floor (weigh your own). Judge top, middle and bottom separately. The two screen candles need only the top third unless they look different.
6
Release to all four, or hold all fourLabel the packs "released __/__" and move them behind the old lot. A fail is recorded against the lot and reported to the supplier with photos and measurements.

Materials for the release test, at 1 kg oil and 10 kg wax prices with eight new-lot wicks: ₹2,222.07, excluding retained wicks and your jars. Testing every one of the four SKUs to the floor instead would roughly double that and the bench time, for little extra information if the bracket is chosen from real approval records (our judgement). If you're unsure which formulas bracket your range, test all four the first time and keep the records.

Don't do this. Don't add four per-SKU buffers together and call it safety; pool them. Don't count quarantined packs as usable stock, or as nothing: they're on order until released. Don't let a stock-out become a substitution; a Woody Oud batch on C1 or Cotton Braided "just this once" is an unapproved formula. Don't quarantine a whole shared lot on one customer photo before burning a retained candle. And don't buy 1,000 wicks of a new spec for four SKUs until every one of them has passed its own full-life approval.

The CSI wick buy list and the step to production

The buffer is a count. The packs are just how you carry it.
Eco Thick (C2) for a four-SKU pool · worked example
CSI live pricing, 7 October 2026 · ₹9.44 a wick at every pack · lead times are yours, not CSI's
Line Wicks Packs ₹ Note
Safety stock, held sealed 155 → 160 100 + 50 + 10 ₹1,510.40 From a released lot; rotated, not raided
Routine order 1,000 1 × 1,000 ₹9,440.00 About 5.9 weeks of use; size it in 6998/6999
Optional lot-failure reserve 594 500 + 50 + 20 + 20 + 10 = 600 ₹5,664.00 Festive run-up only (our judgement)
Average stock carried 655 — ₹6,183.20 Buffer + half an order; peak 1,155

The production step: each time the stock position (on hand + on order + in its lot check) falls to 749, order. In the worked example that's a 1,000-pack about every 5.9 weeks; with the 3.5-week effective lead time there is nearly always one pack on its way or in its check, which is normal for a shared wick. When it arrives, measure and burn it per the release test, then move it behind the old lot. Rotate the sealed safety packs into use every few months so they never become the oldest lot in the building. Argued against our own interest, twice: outside the festive run-up, you don't need the lot-failure reserve; and pooling means you need fewer wicks than four separate buffers, not more. If a single SKU is about to leave the pool (a formula moving to C1, say), recalculate before the next order rather than after.

CSI's range is short: Eco Thin (C1), Eco Thick (C2) and Cotton Braided as sized, tabbed wicks, with nothing in between and one wooden width. That makes pooling natural, because most small ranges end up on one or two wicks. It also means a failed lot has no "nearby size" to borrow, which is the reason the release test and the reserve matter. For the bigger question of buying production quantities only after every fragrance on a wick has passed, see the published post on bulk-buying one wick size.

Diwali is 8 November 2026, 32 days from 7 October 2026. With a 3.5-week effective lead time, a festive reorder point has to be set now, not when the bin looks low. If you're pooling C2 across your festive range, send us the count on WhatsApp and ask about lot information; we'll confirm stock and dispatch with a GST invoice.
WhatsApp a festive C2 order

What to buy, and what to skip

Four items for a shared-wick pool, chosen on page statements, price and stock on 7 October 2026. CSI publishes no wick, soot or lot data, so nothing is ranked on performance, and each card says when not to buy.

1
wick · the shared one
Eco Candle Wicks — Thick (C2)
The wick four SKUs share in the worked example. ₹9.44 a wick at every pack from 10 to 1,000, so the safety stock is a count, not a bulk-buy decision: holding 155 wicks costs ₹1,463.20 whichever packs they come in. In the text we captured the page states no dimensions and no lot information, and claims "minimal soot or smoke" (the page's words). Limitation: one listing, two variants; the C1 10-pack is out of stock on 7 October 2026, which doesn't affect a C2 buffer but matters if any SKU is on Thin (C1).
Pack Price Per wick Use here
Thin (C1) / 10 ₹59.00 ₹5.90 Out of stock on 7 October 2026
Thin (C1) / 20 ₹118.00 ₹5.90 not used in this range
Thin (C1) / 50 ₹295.00 ₹5.90 same per wick
Thin (C1) / 100 ₹590.00 ₹5.90 same per wick
Thin (C1) / 500 ₹2,950.00 ₹5.90 same per wick
Thin (C1) / 1,000 ₹5,900.00 ₹5.90 same per wick
Thick (C2) / 10 ₹94.40 ₹9.44 top-up to a round count
Thick (C2) / 20 ₹188.80 ₹9.44 same per wick
Thick (C2) / 50 ₹472.00 ₹9.44 part of the sealed buffer
Thick (C2) / 100 ₹944.00 ₹9.44 sealed buffer: 100 + 50 + 10
Thick (C2) / 500 ₹4,720.00 ₹9.44 same per wick
Thick (C2) / 1,000 ₹9,440.00 ₹9.44 one order: about 5.9 weeks
Safety stock 155 C2 = ₹1,463.20. Buy C2 1,000 — ₹9,440.00
2
fragrance oil · woody · bracket formula
Woody Oud Fragrance Oil
In the worked example Woody Oud is the shared-wick formula whose approval results sat closest to the soot and mushroom limits, so every new C2 lot is checked in it first. That's the reader's own test record, not CSI data; heavier, resinous oils commonly carry more carbon on the wick, a tendency only. The page states "candles (6-10%)" and says to cure soy candles 48–72 hours before burn testing. Flat per gram from 100 g. Limitation: CSI has no measured wick data for this oil.
Size Price Per gram 200 g candles at 8% (16 g)
15 g ₹93.22 ₹6.21 none (a sniff sample)
50 g ₹271.40 ₹5.43 3
100 g ₹453.12 ₹4.53 6
500 g ₹2,265.60 ₹4.53 31
1 kg ₹4,531.20 ₹4.53 62
16 g a candle = ₹72.50 at the 1 kg price. Buy 100 g — ₹453.12
3
fragrance oil · citrus · bracket formula
Citrus Lemon Fragrance Oil
The other end of the bracket: in the worked example Citrus Lemon is the shared-wick formula whose pool reached the glass slowest at approval, so a weaker lot would show there first. The page states "candles (6-10%)" and a 48–72 hour cure before burn testing. Testing a new lot in both bracket formulas covers the four SKUs' range of behaviour (our judgement). Limitation: lighter oils behaving "cooler" is a tendency, not a rule; your approval records decide which formula is the bracket.
Size Price Per gram 200 g candles at 8% (16 g)
15 g ₹81.42 ₹5.43 none (a sniff sample)
50 g ₹170.00 ₹3.40 3
100 g ₹300.00 ₹3.00 6
500 g ₹1,420.00 ₹2.84 31
1 kg ₹2,832.00 ₹2.83 62
16 g a candle = ₹45.31 at the 1 kg price. Buy 100 g — ₹300.00
4
tool · grams per hour in the release burn
Candle Making Weighing Scale
The release burn compares grams per hour between new-lot and retained-lot candles, and that needs one scale used for every weighing. ₹354.00, in stock on 7 October 2026. Limitation: in the text we captured the page states no capacity or resolution; check it weighs a full candle and reads to at least 1 g before you rely on it for burn rates.
Item Price Use
Scale ₹354.00 weigh each candle before and after every session
One scale for every weighing. Buy — ₹354.00

Skip for now: a 1,000-pack bought only as buffer; a second wick spec held "in case" without a test record; and any oil for a release test that isn't your production oil and load. A lot released in the wrong formula hasn't been released.

The CSI principle
Pool the demand, check the lot. One buffer from your real weekly totals, and no new lot near the bench until it has passed in the formulas that bracket your range.
Lead time = supply + lot check · reorder point = d × L + buffer · reserve for festive months only.
"Four products on one wick is efficient right up to the day the lot is wrong. Plan for that day once, and the rest is arithmetic."
— CandleMakingSuppliesIndia
Why trust this guide

CandleMakingSuppliesIndia sells the wicks and oils named here, not finished candles. This page still tells you that pooling means holding fewer wicks, that bigger wick packs aren't cheaper per wick, that the lot-failure reserve is a seasonal choice, and that we publish no lead times or lot data you can plan on without asking.

Every CSI price was checked on the live store on 7 October 2026, with stock checked per pack (the Eco C1 10-pack is out of stock and is not offered). Page wording is quoted and attributed: Woody Oud's and Citrus Lemon's "candles (6-10%)" and 48–72 hour cure before burn testing, and the Eco page's "minimal soot or smoke" claim.

The four SKUs, eight weeks of demand, the 2-week supply time and its half-week spread, the 1.5-week lot check, the bracket choice, festive factor, floor and burn rate are labelled worked examples; the 1.65 factor is a textbook normal approximation, not a promise of service. For bulk pricing, GST invoicing, and MSDS and IFRA documentation on request, message us on WhatsApp at +91 7397976926.

Frequently asked questions

How do I calculate safety stock for candle wicks?
A common textbook method: 1.65 × the standard deviation of weekly use × √(lead time in weeks), plus a term for lead-time variation. Use your own weekly records and your real lead time, including the days a new lot spends being checked.
Should I keep separate safety stock for each candle SKU that uses the same wick?
No. Calculate one buffer from the combined weekly draw. It's smaller than four separate buffers added together because the SKUs' highs and lows partly cancel, though less than theory suggests if they sell together.
What lead time should I use for wick reordering?
Your measured order-to-door time plus your lot-check time. CSI publishes no lead times; ask on WhatsApp for a realistic dispatch estimate to your city, then log your own arrivals.
What happens if a wick lot used across several candles is bad?
Every SKU on that wick is affected at once. Check each new lot in the two formulas that bracket your range before use, and consider holding one extra lead time of stock before festive seasons.
Is it cheaper to keep wick safety stock in 1,000-packs?
Not at CSI: Eco C1, Eco C2 and Cotton Braided cost the same per wick at every pack. A bigger pack only ties up more cash; hold the count you need.
Can I use a different wick if my shared wick runs out?
Not without testing it in each formula. A substitute wick is an unapproved formula, and in a candle that was wicked down to stop soot it can bring the soot straight back.
One wick · several top-selling SKUs
Pool the buffer, put the lot check inside the lead time, and decide the reserve before the season.
Eco Thick (C2) is ₹9.44 a wick at every pack. Tell us your city and we'll give you an honest dispatch estimate for your reorder point, and say what lot information we have.
Shop Eco Candle Wicks C2 Ask about dispatch on WhatsApp
Editorial standards & sources
About this guide: part of CSI's cluster on moving from a failed wick to the correct CSI wick and a bulk purchase (6981–7000). It covers safety stock for one wick shared by several SKUs: pooling demand, the effective lead time including a lot check, a cause ranking for stock-outs and holds, the pooled calculation step by step, the shared-lot risk with a bracketed release test and an in-house rule, and pack rounding.

Customer reviews: The six reviews at the top of this page are genuine, published Judge.me reviews left by CSI customers on the product pages named on each card — Citrus Lemon Fragrance Oil, Eco Candle Wicks, Lavender Fragrance Oil, Woody Oud Fragrance Oil. They are general product reviews, not assessments of the burn and wick advice on this page. Names, star ratings, dates and products are as recorded by Judge.me and wording is unedited. "Verified buyer" appears only on reviews Judge.me recorded as verified — Subhankar Roy, Monika Deep, Payal Patel, Avanthi Cheeli, Akansha. The reviews from Ashwini are published but not recorded as verified, and carry no badge. Reviews below five stars are included as published, not filtered out.

Figures verified 7 October 2026, CSI live pricing: Eco Candle Wicks Thick (C2) 10 ₹94.40, 20 ₹188.80, 50 ₹472.00, 100 ₹944.00, 500 ₹4,720.00, 1,000 ₹9,440.00 (₹9.44 a wick); Thin (C1) 10 ₹59.00 (out of stock), 20 ₹118.00, 50 ₹295.00, 100 ₹590.00, 500 ₹2,950.00, 1,000 ₹5,900.00 (₹5.90 a wick); Woody Oud Fragrance Oil 15 g ₹93.22, 50 g ₹271.40, 100 g ₹453.12, 500 g ₹2,265.60, 1 kg ₹4,531.20; Citrus Lemon Fragrance Oil 15 g ₹81.42, 50 g ₹170.00, 100 g ₹300.00, 500 g ₹1,420.00, 1 kg ₹2,832.00; Lavender Fragrance Oil 1 kg ₹5,221.00; British Rose Fragrance Oil 1 kg ₹3,068.00; Luxury Soy Wax CSI 464 10 kg ₹5,074.00; Candle Making Weighing Scale ₹354.00. Per unit = price ÷ units, two decimals; release-test materials use exact prices. CSI lists no non-contact thermometer.

Non-price figures: the 200 g candle at 8% (16 g oil + 184 g wax, total-weight basis) in the reader's 8 cm jar is the series default, labelled; oil pages state "candles (6-10%)" (Woody Oud, Citrus Lemon) and CSI 464's page "Up to 10%" (a formulation limit, not a regulatory one). Weekly demand, the 2-week supply time and 0.5-week spread, the 1.5-week check, festive factor, floor and 7 g an hour are labelled worked examples; the safety-stock formula and 1.65 factor are a textbook method; the release rule is an in-house protocol. Trim 5–6 mm and the 1 cm floor are common rules of thumb. Costs are materials only and exclude labour, freight, packaging and GST. Diwali 8 November 2026 is a calendar fact.
ब्लॉग पर वापस जाएं