Critical materials · delivery date
The date is the last thing you calculate, not the first thing you promise.
★★★★★
"My customer was very happy with this apple cinnamon fragrance. As soon as they entered their home this smell is warmth and pleasing. And I got many orders who visited their home, as they also loved the smell."
PREETHI PRASATHVerified buyer · May 2026
Apple Cinnamon Fragrance Oil
★★★★☆
"Good product and I fully satisfaction with my end result"
Urvashi PatelVerified buyer · Aug 2026
Sacred Sandal Ember Fragrance Oil
★★★★★
"Super productsss"
Suvarna PVerified buyer · Sep 2025
Candle Dye Liquid
★★★★★
"Candles dyes are very good quality and I loved the way they work with all kinds of waxes. Very good"
Antara Srinivas IyerVerified buyer · May 2025
Candle Dye Liquid
★★★★★
"Soy wax quality is the best, which ever products ordered were properly packed and delivered as early as possible, timely response to the inquiries. Good service"
Jaya SawlaniVerified buyer · Nov 2025
Luxury Soy Wax CSI 464 (Flakes Form) For Container Candles
★★★★★
"Really nice fragrance, we continue our shopping going forward."
Uchu OmoideVerified buyer · Sep 2025
Fresh Strawberries
Reviews collected and published through Judge.me on candlemakingsuppliesindia.store. They are general reviews of the products named on each card, not assessments of the advice set out below. Wording is unedited.
✓ Prices verified 7 October 2026, stock checked per pack ✓ GST invoice; MSDS and IFRA documentation on request ✓ Raw materials only — CSI does not sell finished candles
CSI Wedding Orders · Delivery Dates
A wedding date is only as real as the last critical material to arrive. Register every item, secure it in hand or in writing, and calculate the date from the last arrival forward.
Day 49
honest promise date for a worked 800-candle order, counted from acceptance · CSI live pricing, October 2026
Quick answers — read this first
Should I secure every critical material before promising a wedding date? Yes. A delivery date is only as real as the last critical material to arrive. Until every item that gates pouring or packing is in hand (or confirmed in writing with a dispatch date), quote a date relative to sign-off, not a calendar date.

What is the rule? Date = last critical material arrival + inspection + production + cure + QC + packing + delivery, plus slack. In the worked 800-candle order the printed boxes arrive last (day 33), so the simple rule gives day 56.

Can I promise sooner? Only by letting each material gate just the step that uses it. Pouring needs the jars (day 26) but not the boxes; packing needs the boxes. That refined plan gives day 49, 7 days earlier, if you track it item by item.

What if the client wants day 45? Then something on the critical path must change, not the cure: standard packaging instead of printed boxes, and a jar that arrives with the wax. That path reaches day 45 with three days of slack; promising day 45 with the original materials would be promising days that do not exist.
The short answer
The rule: date = last critical arrival + inspection 1 + pouring 6 + cure 7 + QC 2 + packing 2 + delivery 2 + slack 3 days.
The critical list: jar, oil, dye, wick, wax and printed packaging, each with its supplier’s lead time and the step it gates.
The worked dates: sign-off day 16; boxes day 33; simple rule day 56; refined plan day 49; client’s day 45 only on the standard-packaging path.
The protection: quote "49 days from acceptance, subject to sample sign-off by day 16 and the advance", then fix the calendar date once every critical item is in hand.
The date is the last thing you calculate Worked 800-candle wedding order. Days from acceptance. Lead times are your suppliers’ figures. 0 10 20 30 40 50 60 Sample stage → sign-off day 16 CSI wax, oil, dye, wicks arrive 22 Jars (your supplier) arrive 26 Printed boxes (your printer) arrive 33 Inspect jars, then pour pour 27–33 Cure calendar time QC from the production lot Pack (boxes in hand) Deliver day 46 Slack promise day 49 simple rule: day 56 client asked for day 45 Hatched = the last critical arrival. Refined plan: each material only gates the step that uses it. All durations are labelled worked examples; CSI publishes no dispatch times — confirm on WhatsApp.
The worked timeline. After sample sign-off on day 16, three supply lines run in parallel; the printed boxes (hatched) arrive last, on day 33. Because boxes are only needed for packing, pouring starts when the jars are inspected, and the refined plan delivers on day 46 with a promise date of day 49. Adding every step after the last arrival, the simple rule, gives day 56.
Straight answer
Should I secure all critical custom materials before promising a final wedding delivery date?
Yes. List every material that gates a production step (jar, fragrance oil, dye, wick, wax, printed packaging), write down each supplier’s lead time, and count a material as secured only when it is in your hands and inspected, or confirmed in writing with a dispatch date. The delivery date is then arithmetic: the last critical arrival, plus inspection, pouring, cure, QC, packing and delivery, plus slack. In the worked 800-candle order, with sample sign-off on day 16, CSI materials on day 22, jars on day 26 and printed boxes on day 33, the simple rule gives day 56; letting each material gate only the step that uses it gives day 49. Until the items are secured, quote the date as days from sign-off and advance, not as a calendar date. If the client needs it sooner, change the critical path (standard packaging, a faster jar), never the cure or the burn test. This is practical judgement, not legal advice.
One line: no date before the materials; the date is the last critical arrival plus every step after it.
Before sign-off, buy only the sample stage: Raat Ki Rani 2 × 100 g + 50 g (₹1,770.00), Red dye 15 gm (₹236.00), C2 and Cotton Braided 10-packs (₹214.40), CSI 464 3 × 1 kg (₹1,522.20). In stock on 7 October 2026.
See Raat Ki Rani — 100 g ₹700.00

Your order as numbers

A date with no lead times behind it is a guess wearing a calendar.

The title gives no figures, so this is a worked example to replace with your own. A wedding client wants 800 candles of 200 g at 8% (16 g oil + 184 g wax, total-weight basis), scented with Raat Ki Rani, coloured a soft red with Red Candle Dye Liquid at your recipe’s 0.5 g per kg of wax, in a 200 g jar from your glass supplier (₹55.00 each, 10-day lead), packed in boxes printed with the couple’s names (₹38.00 each, 17 days after artwork sign-off). Wax, oil, dye, wicks and stickers come from CSI on a 6-day planning figure, which is yours, not ours: CSI publishes no dispatch or transit times. You produce about 150 candles a day from a 10 kg melter (three melts of 50, worked). Price ₹480.00 a candle (₹3,84,000.00).

The worked order
Labelled worked examples unless marked as CSI prices · day numbers are counted from acceptance
Fact Figure Why it matters
Candles and fill 800 × 200 g at 8% Sizes every material line
Planned extras and loss 10 extras; 4% mix loss → 844 candles’ worth Series conventions
Sample sign-off day 16 No bulk material is ordered before it
Longest lead time printed boxes, 17 days The last critical arrival
Production rate about 150 a day → 6 pouring days Your capacity, worked
Cure before QC and packing 7 days Calendar time; no labour shortens it

The critical-materials register

If it can stop a step, it is critical, however cheap it is.

A material is critical if production cannot continue without it. That includes the obvious (jars, oil) and the easily forgotten (a ₹900.00 dye bottle, the right wick, the box the candle ships in). The register lists each one, who supplies it, its lead time from your supplier, which step it gates, and what "secured" means for it.

The critical-materials register · worked order
Lead times are your suppliers’ figures (worked) · "secured" = in hand and inspected, not "ordered" · CSI publishes no dispatch times
Material Supplier Lead time Gates which step Arrives (day) Secured when If it slips
Raat Ki Rani, 13.65 kg CSI 6 days (confirm) Pouring 22 Bottles in hand, lot noted, sniff-checked against the sample Pour waits; every later step moves
Red dye, 100 gm CSI 6 days (confirm) Pouring 22 Bottle in hand Pour waits
CSI 464, 16 × 10 kg CSI 6 days (confirm) Pouring 22 Bags counted Pour waits
Eco C2, 870 CSI 6 days (confirm) Pouring 22 Counted, tabs checked Pour waits
200 g jars, 827 Your glass supplier 10 days Pouring 26 Counted, inspected, sample measured Pour waits
Printed boxes, 827 Your printer 17 days after artwork Packing 33 Counted, print checked against the proof Packing waits
Care stickers, 1,000 CSI 6 days (confirm) Packing 22 Roll in hand Packing waits

Two columns do most of the work. "Gates which step" stops you treating every late item as equally fatal: boxes late by three days cost nothing if they still arrive before packing. "Secured when" stops you counting an item that is merely ordered. A supplier’s "in stock" on a website, ours included, is not secured: CSI shows whether a pack is in stock, not how many, and does not promise dispatch days.

Argued against our own interest: the CSI lines on this register are standard and reusable, which makes it tempting to buy them early "to secure them". Buy the sample-stage packs (₹3,742.60) before sign-off and the bulk only after it. If the client rejects the sample or changes the scent, 13.65 kg of Raat Ki Rani bought on day one is your problem, not theirs. Secure early by asking: send the list on WhatsApp and ask for stock and a dispatch date in writing, then buy on sign-off.

Questions that turn a lead time into a commitment

A lead time is only useful if you know what it starts from and what it ends with. Ask every supplier the same four questions and write the answers into the register: from when (order, payment, or artwork sign-off?), to when (dispatch, or arrival at your door?), how many from one batch (so a second lot does not surprise you), and what happens in a slip (do they tell you, and how early?). For printed packaging add a fifth: how many proof rounds are included, because each extra round is days the client spends, not the printer. For CSI lines, the honest answer to "to when" is that we confirm a dispatch date on WhatsApp for your specific order; transit after that depends on the courier and your city, so your planning figure should include it.

Which items need a deeper buffer because they can never be replaced in time is a separate question: custom jars are 6352, custom oils, colours and labels 6353. If a supplier can only provide part of a critical item, 6354 handles the shortfall.

The date rule, simple and refined

Start with the safe rule. Earn the faster one by tracking every item.

The simple rule

Date = last critical arrival + inspection + production + cure + QC + packing + delivery + slack. It assumes nothing starts until everything is in, which is pessimistic but almost impossible to get wrong. In the worked order: boxes on day 33 + 1 + 6 + 7 + 2 + 2 + 2 = day 53, plus 3 days of slack = day 56. The tail after the last arrival is 23 days, and it is the same whichever item is last.

The refined rule

Each material only has to arrive before the step that consumes it. Jars, wax, oil, dye and wicks gate pouring; boxes and stickers gate packing. So pouring starts when the last pouring material is inspected (jars, day 26 + 1), and packing only needs the boxes once QC is done on day 42, which their day-33 arrival comfortably beats.

Simple against refined · worked
Days counted from acceptance · each step ends on the day shown
Step Simple rule Refined rule What gates it
Last critical arrival day 33 (boxes) day 26 (jars, for pouring) The item the step needs
Inspection done 34 27 Counting and checking
Pouring done 40 33 6 days at 150 a day
Cure done 47 40 7 days, calendar time
QC done 49 42 Burn check from the production lot
Packed 51 44 Boxes in hand since day 33 + 1
Delivered 53 46 2 days
Promise, with slack day 56 day 49 3 days slack

The refined plan recovers 7 days, but only if you track each item against its own need-by day. If the printer slips by more than the cushion between day 33 and packing on day 42, the boxes become the critical path again. That is why the register has an "if it slips" column, and why the slack stays in.

When something does slip, recalculate the same day and tell the client the same day. A printer who moves from day 33 to day 40 still leaves packing on time in the refined plan (QC finishes on day 42); a jar delivery that moves from day 26 to day 30 pushes every later step by four days, and the slack is gone. The register tells you which of those you are facing in a minute, and the client hears it from you rather than discovering it.

Slack is not padding
Three days of slack covers a courier delay, a re-pour of one batch or a sick day. If you find yourself spending the slack to make the date work on paper, the date is wrong.

When the client’s date is earlier than yours

You cannot negotiate with a cure. You can negotiate with a box.

Suppose the client needs delivery on day 45 and your refined plan says 49. The temptation is to squeeze the steps that look soft: shorter cure, quicker QC, no slack. Those are the steps that protect the candle. The honest move is to change the materials that set the critical path.

Ways to reach an earlier date · worked
Only changes to the critical path move the date honestly
Change Effect on the critical path New promise day Cost or trade-off
None (refined plan) jars gate pouring from day 26 49 Misses day 45
Standard packaging only boxes leave the critical path; jars still gate 49 No gain on its own: jars are the constraint
Jar that arrives with the CSI order, plus standard packaging pouring starts day 22 + 1 45 Client accepts a different jar and plain boxes with printed labels
Shorter cure moves QC earlier not offered Throw is judged on uncured candles; quality risk
Skip QC burn from the production lot saves 2 days not offered You ship untested candles

In the worked numbers, day 45 is reachable only on the third row: a jar that ships with the wax (one you already hold, or a standard jar available in the quantity with the same dispatch), and standard packaging with a printed sticker instead of a printed box. Both are client-visible changes, so they are the client’s choice, offered with the dates side by side. If they want the printed box and their jar, the date is 49. Whether cure can be shortened at all for a corporate rush is argued in the shorter-cure post; the answer for a wedding you have one chance at is usually no.

Mistake: promising day 45 because "the printer usually delivers early". Why it fails: the date then depends on the best case of your slowest supplier, and wedding season is when printers and couriers are busiest. Fix: promise from the supplier’s stated lead time; treat an early delivery as slack you did not have to use.

The purchase sheet, and when each line is bought

Sample sizes before sign-off. Everything else the same day as sign-off.
Bulk purchase sheet · placed on day 16, after sign-off
CSI prices live on 7 October 2026 · jars and boxes are your suppliers’ worked figures · excludes labour, freight and GST
Line Required + extras and loss Pack rounding Final order ₹ Left over
Luxury Soy Wax CSI 464 156.85 kg in 844 candles’ worth + 1% heel 10 kg packs 16 × 10 kg ₹81,184.00 3.15 kg, reusable
Raat Ki Rani 13,639.04 g same basis 1 kg + 500 g + 100 g + 50 g 13,650 g ₹92,519.00 10.96 g
Red dye 78.42 g at the recipe dose 100 gm bottle 1 ₹900.00 a little
Eco C2 wicks 844 +2% spares 500 + 100s + 50 + 20 870 ₹8,212.80 9, reusable
Care stickers 810 roll of 1,000 1 ₹699.00 190
200 g jars (your supplier) 810 +2% breakage → 827 none 827 ₹45,485.00 none planned
Printed boxes (your printer) 810 +2% → 827 none 827 ₹31,426.00 none planned
Total ₹2,60,425.80 CSI lines ₹1,83,514.80

All bulk lines are ordered on day 16, the day the client signs the physical sample; the sample stage before it used 240 g of oil (a 6/8/10% ladder plus a two-wick bracket), 2.76 kg of wax and the 10-packs of wicks. Materials come to ₹325.53 per saleable candle, excluding labour, freight and GST. Raat Ki Rani is the largest CSI line, and its 1 kg costs exactly two 500 g, so there is no bulk discount hiding in the pack choice. The full method for building these lines from a client’s PO is the bulk purchase sheet post; the development tracks that run before sign-off are 6358.

Ordering everything on one day is also a cash event: ₹2,60,425.80 leaves your account before a single candle is poured. That is why the advance is collected at sign-off, and why the date in the quote should be tied to both.

What you never skip, and how to word the date

Quote the date as a formula until the materials make it a fact.
1
Build the register on the day of the enquiryEvery material, supplier, lead time, gated step and "secured when".
2
Ask each supplier for lead time and stock in writingFor CSI, send the full list on WhatsApp; we confirm what we can, and say plainly what we can’t promise.
3
Run the sample stageLoad ladder and wick bracket in your jar with Raat Ki Rani and the red; cure, burn to the final third, send a physical sample. Sign-off on day 16 in the worked plan.
4
Order every critical line on sign-offWith the advance received; note each arrival date against its need-by day.
5
Inspect on arrivalCount, check and compare against the approved sample (oil lot sniffed against the sample bottle; jars measured; print checked against the proof).
6
Fix the calendar date when the last pouring material is securedThen tell the client the date: day 49 in the worked plan, unless something slipped.
What must not be skipped, and the calendar time it needs
Worked plan · cure and burn tests are calendar time, not labour
Step Why Calendar time
Sample stage with a physical, signed sample Fragrance, colour and wick approved in the real jar 16 days in the worked plan
Incoming inspection of every critical item A faulty delivery found after pouring costs days 1 day per delivery
Cure before QC and packing Soy commonly needs time before hot throw is judged 7 days
QC burn from the production lot Proves the bulk behaves like the sample 2 days
Slack Absorbs a courier delay or one re-pour 3 days
Commercial protection (practical judgement, not legal advice): in the quote, write the delivery as "49 days from acceptance, subject to sample sign-off by day 16, receipt of the advance, and confirmed availability of the approved materials", and add that a change to an approved material after sign-off moves the date. Convert it to a calendar date in writing once every critical item is in hand. A client who wants a fixed calendar date on day one is asking you to carry your suppliers’ risk; price it or decline it. The approvals list is 6359; the whole flow with gates is 6360.
Keep a backup list, not backup stock
For each critical item, note one alternative you could switch to and what it would need (a retest, a client signature). Pre-qualifying alternatives before an emergency is the backup-supplier post; for a wedding, it is a list, not a warehouse.
This page is for you if a client wants a firm wedding delivery date and you are deciding when you can honestly give one. Read elsewhere if you already know one material is short (6354), you are planning the custom development tracks (6358), or you want the whole order flow (6360).

The CSI materials on the register

The standard materials CSI supplies for the worked order; jars and printed boxes come from your own suppliers. Nothing is ranked on performance (CSI publishes no burn data).

1
fragrance oil · the approved scent · critical item
Raat Ki Rani (Night-Blooming Jasmine) Fragrance Oil
The worked order’s oil. The page lists "Top Notes: Green Stems, Fresh Ozone | Middle Notes: Night-Blooming Jasmine, White Florals | Base Notes: Soft Amber, Musk" and states "Recommended fragrance load is 6-10% for candles"; CSI 464’s ceiling is also 10%. Two honest notes for a date-critical order: the 1 kg costs exactly two 500 g packs (₹6,774.00), so there is no bulk saving at the top; and the product link still carries an old "ships 21st June 2025" date in its address although the oil is in stock, so confirm the dispatch date on WhatsApp rather than reading anything into it. The captured text states no cure time.
Size Price Per gram In the plan
15 g ₹130.00 ₹8.67
50 g ₹370.00 ₹7.40 sample stage (1)
100 g ₹700.00 ₹7.00 sample stage (2); order (1)
500 g ₹3,387.00 ₹6.77 order (1)
1 kg ₹6,774.00 ₹6.77 order (13)
2
dye · critical item · small, cheap, and easy to forget
Candle Dye Liquid | Red
A 100 gm bottle (₹900.00) covers the worked 78.42 g at your recipe’s 0.5 g per kg of wax. CSI publishes no dye dose; the dose is your approved recipe. Cheap items are exactly the ones that get left off the register and then hold up a batch: buy the order’s dye with the wax, not when the pot is already hot. Note the listing’s middle size is labelled 50 ml while the others are in grams.
Size Price Use here
15 gm ₹236.00 sample stage
50 ml ₹472.00
100 gm ₹900.00 1 for the order
3
wax · critical by quantity, not by risk
Luxury Soy Wax CSI 464 (Flakes Form)
Standard and reusable, but at 156.85 kg it is the heaviest line, and nothing pours without it. The page states a pour temperature of 80°C–90°C and a load up to 10%; check your jar supplier’s heat wording against that. Flat per kilo from 1 kg, so the 16 × 10 kg (₹81,184.00) cost the same per kilo as the 3 × 1 kg for the sample stage.
Size Price Per kg In the plan
500 g ₹260.00 ₹520.00
1 kg ₹507.40 ₹507.40 3 for the sample stage
5 kg ₹2,537.00 ₹507.40
10 kg ₹5,074.00 ₹507.40 16 for the order
Order: ₹81,184.00. See CSI 464 — 10 kg ₹5,074.00
4
wicks · critical, and decided by the sample stage
Eco Candle Wicks Thick (C2)
The order wick only once the sample-stage bracket (C2 against Cotton Braided) has picked it in your jar with this oil. Flat ₹9.44 a wick at every pack, so the 870 (₹8,212.80) cost the same per wick as the 10 you test with. The page states no length or jar-diameter range. The Thin (C1) 10-pack is out of stock on 7 October 2026.
Pack Price Per wick In the plan
Thin (C1) / 10 ₹59.00 Out of stock on 7 October 2026
Thick (C2) / 10 ₹94.40 ₹9.44 sample bracket
Thick (C2) / 20 ₹188.80 ₹9.44 1
Thick (C2) / 50 ₹472.00 ₹9.44 1
Thick (C2) / 100 ₹944.00 ₹9.44 3
Thick (C2) / 500 ₹4,720.00 ₹9.44 1
Order: ₹8,212.80. Buy C2 10 — ₹94.40
5
labels · standard · not on the critical path
Candle Care Stickers Roll
Safety labelling is part of a finished candle, but a standard roll is not a lead-time risk the way printed boxes are. The 1,000-sticker roll is 1.5 inch, the 500 roll 1 inch; pick by your label layout, not just the count.
Pack Price Per sticker In the plan
Pack of 500 (1 inch) ₹413.00 ₹0.83
Pack of 1000 (1.5 inch) ₹699.00 ₹0.70 1 for the order
Wedding season is commonly November to February, and lead times stretch in it. Before you give a client a calendar date, send us your CSI list on WhatsApp: we will confirm stock, lots and a dispatch date with a GST invoice, and tell you plainly what we can’t promise.
WhatsApp before you promise a date
The CSI principle
The date is the last thing you calculate, not the first thing you promise.
Register every critical material, secure it in hand or in writing, add every step after the last arrival, keep the slack, and quote a relative date until the arithmetic is real.
"Nobody remembers the candle that arrived early. Everybody remembers the one that did not arrive."
— CandleMakingSuppliesIndia
Why trust this guide

CandleMakingSuppliesIndia supplies the wax, oil, dye, wicks and stickers in this example, and does not make jars, printed boxes or finished candles. This page still tells you to buy only sample sizes from us before sign-off, that the 1 kg of the worked oil saves nothing over two 500 g packs, and that our in-stock status is not the same as secured supply.

Every CSI price was checked on the live store on 7 October 2026; every pack offered here is in stock on that date, and the Eco C1 10-pack, which is out, is not offered. CSI publishes no stock depth, no dispatch or transit times and no lot sizes: confirm those on WhatsApp.

The 800-candle order, lead times, production rate, cure, QC, packing, delivery and slack durations, jar and box prices, dye dose and client price are labelled worked examples; prices are data. This is practical judgement, not legal advice. For bulk pricing, stock and lot confirmation, GST invoicing, and MSDS and IFRA documentation on request, message us on WhatsApp at +91 7397976926.

Frequently asked questions

How do I calculate a delivery date for a bulk candle order?
Take the arrival day of the last critical material and add inspection, pouring, cure, QC, packing and delivery, then slack. In the worked order that is day 56 on the simple rule and day 49 if each material only gates the step that uses it.
What materials are critical for a wedding candle order?
Anything that stops a step: jars, fragrance oil, dye, wicks and wax gate pouring; printed boxes and labels gate packing. Cheap items count too.
Should I give the client a fixed date before buying materials?
Give a relative date (days from sample sign-off and advance) until every critical material is in hand or confirmed in writing, then convert it to a calendar date.
Can I shorten curing to meet a wedding date?
Not safely as a default. Cure and burn testing are calendar time; change the critical-path materials, such as packaging or the jar, instead of the cure.
How long does CSI take to dispatch a bulk order?
CSI does not publish dispatch or transit times. Send your list on WhatsApp and ask for stock, lots and a dispatch date in writing before you commit a date to your client.
What does "secured" mean for candle materials?
In your hands and inspected, or confirmed in writing by the supplier with quantity and dispatch date. "In stock" on a website or a verbal yes is not secured.
Materials first, date second
Register, secure, add up, and only then promise.
For the worked order: sign-off day 16, boxes day 33, simple rule day 56, refined day 49, and day 45 only with standard packaging and a faster jar. Sample-stage packs from CSI cost ₹3,742.60; the bulk waits for sign-off.
Shop Raat Ki Rani Ask for a dispatch date on WhatsApp
Editorial standards & sources
About this guide: part of CSI's cluster "Wedding orders and customisation" (6341–6360) in the series on bulk corporate and wedding candle orders × raw materials. It covers why every critical material should be secured before a wedding date is promised: the critical-materials register, the simple and refined date rules with a worked timeline, what to change when the client’s date is earlier, the purchase sheet and its timing, and how to word the date.

Customer reviews: The six reviews at the top of this page are genuine, published Judge.me reviews left by CSI customers on the product pages named on each card — Apple Cinnamon Fragrance Oil, Candle Dye Liquid, Fresh Strawberries, Luxury Soy Wax CSI 464 (Flakes Form) For Container Candles, Sacred Sandal Ember Fragrance Oil. They are general product reviews, not assessments of the bulk-order advice on this page. Names, star ratings, dates and products are as recorded by Judge.me and wording is unedited. "Verified buyer" appears only on reviews Judge.me recorded as verified — PREETHI PRASATH, Urvashi Patel, Suvarna P, Antara Srinivas Iyer, Jaya Sawlani, Uchu Omoide. Reviews below five stars are included as published, not filtered out.

Figures verified 7 October 2026, CSI live pricing: Raat Ki Rani (Night-Blooming Jasmine) Fragrance Oil 15 g ₹130.00, 50 g ₹370.00, 100 g ₹700.00, 500 g ₹3,387.00, 1 kg ₹6,774.00; Candle Dye Liquid Red 15 gm ₹236.00, 50 ml ₹472.00, 100 gm ₹900.00; Luxury Soy Wax CSI 464 500 g ₹260.00, 1 kg ₹507.40, 5 kg ₹2,537.00, 10 kg ₹5,074.00; Eco Candle Wicks Thick (C2) 10 ₹94.40, 20 ₹188.80, 50 ₹472.00, 100 ₹944.00, 500 ₹4,720.00 (Thin (C1) 10-pack out of stock); Cotton Braided Wicks Ready Made 10 ₹120.00; Candle Care Stickers Roll 500 ₹413.00, 1,000 ₹699.00. Per gram and per wick = price ÷ count, two decimals. Stock depth, dispatch dates and lot continuity are not published: confirm on WhatsApp.

Non-price figures: the title gives no figures; the 800 × 200 g order at 8% (total-weight basis), 10 extras, 4% mix loss, 1% heel, 2% breakage and wick spares, 0.5 g dye per kg of wax, ₹55.00 jars, ₹38.00 printed boxes, every lead time, the 150-a-day rate and every duration are labelled worked examples. Raat Ki Rani’s page states 6–10% for candles and CSI 464’s up to 10%; ceilings are formulation limits, not regulatory ones. This is practical judgement, not legal advice.